My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25780
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:59 PM
Creation date
11/21/2007 11:07:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Name
PN COG-850000 COVERAGE UNDER THIS PERMIT
Violation No.
CV1996011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~/h f '~ <br />/!/ PART I <br />~/// Page 4 <br />Permit No <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations (continued) <br />a) Active Mining Outfall(s) (continued) <br />ALTERNATE LIMITATIONS <br />COG-850000 <br />Any discharge or increase in the volume of a discharge caused by <br />precipitation within any 24-hour period less than or eeual to the <br />j_0-year. 24-hour orecinitation event (or snowmelt of equivalent <br />volume) ma comply with the following limitations subject to <br />burden of proof requirements described in Part I.B.l.d). <br />Effluent Parameter <br /> <br />Flow, MGD <br />pH, standard units (minimum-maximum) <br />Oil and Grease, mg/1 (No visible sheen) <br />Settleable Solids, ml/1 g/ <br />Total Dissolved Solids, mg/1 <br />(Colorado River Basin Only) <br />Discharge Limitations <br />Maximum Concentration <br />Daily Maximum <br />Report <br />b,5-9.0 <br />10 J <br />0,5 <br />Report <br />Total Phosphorus (as P), mg/1 Report <br />(Dillon Reservoir and Upper Bear Creek Drainages Orly) <br /> <br />Any discharge or increase in the volume of a discharge caused by <br />precipitation within any 24-hour period greater than the 10-year. <br />24-hour precipitation event (or snowmelt of equivalent volume) <br />may comply with the following limitations subject to burden of <br />proof requirements describd in Part I.B.l.d), <br />Flow, MGD - monitoring only per Part I.B.2,a) <br />pH shall remain between 6,5 and 9.0 s.u. <br />Oil and grease shall not exceed IO mg/1. J <br />Total Dissolved Solids, mg/1 - monitoring only per Part I.B.2.a) <br />(Colorado River Basin Only) <br />Total Phosphorus (as P), mg/1 - monitoring only per Part I.B.2.a) <br />(Dillon Reservoir and Upper Bear Creek Drainages Only) <br />b) Posr.-Mining Outfall(s) <br />Post-mining limitations may apply to outfalls serving surface <br />areas which have been returned to the required contour and on <br />which revegetation (specifically, seeding or planting) work has <br />commenced. The permittee may request consideration for change <br />from active mining limitations to post-mining limitations when <br />these conditions have been met, Each facility certification <br />shall state whether active mining or post-mining limitations <br />apply to each authorized outfall. <br /> <br />See Parc I.B.4. for Footnotes <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.