My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-15_REVISION - M1983141 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-15_REVISION - M1983141 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:23 PM
Creation date
11/21/2007 11:06:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/15/2006
Doc Name
Construction Costs for Hydraulic Bulkheads in Underground Mines
From
DMG
To
Mining and Environmental Services
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t- <br />8Vm'iQYStaE L;OLa COAPOltbTtOiQ <br />Anf ECHO 8AY COA4pA~fY <br />P.O. Box 177 . Silverton, CO 81433 ' <br />Phone (303) 387-5533 . Telecopy (303) 387-5310 <br />July Ol, 1996 <br />iii iiiniii~iiii iii <br />oc(:FIUED <br />Jul 0 5 1996 <br />Division of Minerai5 ~ Geob9Y <br />M[r. Allen Sorenson <br />Department of Natural Resources <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: File No. M-77-378, TR-14, COMMITMENT NO. 3 <br />Bulkhead Construction Costs <br />Dear Mr. Sorenson: <br />Sunnyside Gold Corporation (SGC) submits the following attached <br />direct coat summaries for construction of the Terry Tunnel and <br />American Tunnel bulkheads as agreed to under COMMITMENT NO. 3 of <br />TR-ia. These cost summaries are to be used to aid the Division and <br />SGC in setting the bond amount for one time bulkhead replacement. <br />In order to accurately state the costs, the wages were inflated to <br />1996 levels and costs were added to account for SGC equipment usage <br />and the cost of other equipment rental that SGC did not incur <br />because of trades made with an equipment dealer. An additional <br />person was also added to the costs as an outside person where 3GC's <br />water treatment operator served this purpose. The costs of a third <br />Moran car were not added in because its value was minimal during <br />the American Tunnel pour. <br />These summaries include costs that would not be incurred by the <br />Division if a bulkhead replacement was required under the direction <br />of the Division such as; <br />1) ventilation installation at each site. <br />2) establishing coffer dams and/or water diversions. <br />3) one half of the form building and bracing. in all <br />probability, a replacement would entail adding on to the <br />present bulkheads and depending on circumstances may not <br />even include piping. <br />4) placing debris screens and limestone. <br />5) a hoistman would no longer be required for constructing <br />a Terry Tunnel bulkhead. <br />,.:~ <br />•.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.