Laserfiche WebLink
<br />STATE { ~airiirirt~irrrrr'r; <br />OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1317 Shaman Sl., Roan 21 S ` <br /> <br />Denver, Cobrado 80203 ~ <br />~~~~~ <br /> <br />Phone: 13031 866-3567 <br />FAX:13031872-8106 <br /> <br />POSt-IP Pax Note 7671 Date <br /> <br />~ <br />-9- G ~.- ~ I <br /> 7e F,~ <br />A v r r, o ( <br />orQ s DEPARTMFNf OF <br />NATURAL <br /> ~~~ ~. <br />r' <br />t' mG- <br />~~~~5 <br />August 9, 1996 ~~ <br />Pnonea <br /> <br />Mr. Larry Perino Fax g 70 ` -. (~? /Q Fen • <br />7 7 R('~mmiar <br /> <br />Sunnyside Gold Corp. i pores 5. Lochhead <br />Executive o+rKta <br />P.O. Box 177 <br />Michael B, long <br />Silverton, CO 61433 Division Directs <br />RBt Finanoial Warrantp for BulkheaQ Replacement, 8unnpaide <br />I[ine, Technical Revision TR-014, Permit No. K-77-378 <br />Dear Mr. Perino: <br />In order to satisfy Commitment #3 to the approval of Technical Revision <br />TR-014, 3unnyside Gold Corporation (SGC) has provided a Letter of Credit <br />in the amount of $500,000.00. This dollar amount was determined based on <br />the SGC estimate of discounted direct costs plus $115,000.00 to cover <br />indirect costs as detailed in your letter and attachments dated July 1, <br />1996. It is the Division's position that most of the discounts detailed <br />in your letter would not be realized in the event that the Division had <br />to replace the bulkheads under a bond forfeiture (see memorandum prepared <br />by Tom Gillis dated July li, 1996). The one discount item that would <br />obviously be realized is that a direct cost for a hoistman would not be <br />necessary. In addition, it is the Division's position that daily expenses <br />for project labor should be included in the estimate, and as such, your <br />direct cost for meals during the bulkhead concrete pours can be <br />discounted. Also, the Division believes that detailed indirect costa need <br />to be broken-out as a refinement to the SGC estimate. Based on the <br />foregoing discussion, the Division's estimate of direct and indirect costs <br />for bulkhead replacement are presented here: <br />Direct Costs: $550,601.00 from SGC estimate <br />(10,800.00) hoistman <br />(902.00) meals during pour <br />40.560.00 $65 per diem for 624 laborer-days <br />Total Direct: $579,459.00 <br />Indirect Costs: $8982.00 Public Liability Insurance.. 1.55$ dir. <br />5650.00 Performance Bond.. ......... .975$ dir. <br />57,946.00 Contractor's Profit......... 10.08 dir. <br />11,589.00 Contractor's Contingency.... 2.08 dir. <br />Total Indirect: $84,167.00 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus overhead, profit, and <br />contingency): $663,626.00 <br />