My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25735
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:58 PM
Creation date
11/21/2007 11:06:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
Enforcement
Doc Date
5/9/1979
Doc Name
REGION V ON SITE INSEPCTION REPORT
Violation No.
CV1988009
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DORCtIESTER COLOPtINE <br />715.15 Disposal of Spoil and lJaste <br />NI further disposal of spoil and waste off of the Cameo seam <br />face up has taken place since the last inspection. The upper <br />portal is not presently operating because the mine portals have <br />reached the edge of a potential Preference Riglit Federal Coal Lease, <br />which leas not yet been issued. No Eur[Irer mining can take place at <br />this seam until the Federal lease is issued. <br />T}iis operation is going to need a waste disposal area in [he <br />future. Regulations applicable to waste disposal were discussed <br />wi!ith Darrel Hespe. The operator was advised that 30 CFR 715.17(b) <br />and (c) prohibits the disposal of coal waste in valley or head of <br />hollow fills. The operator stated that they are considering <br />seiveral areas, some on BLM land for a disposal area. The operator <br />seated they were aware [hat areas with drainages should be avoided <br />toy simplify environmental compliance. <br />717.16 Topsoil and Handlin <br />i <br />Toipsoil has been salvaged and stored. A cursory examination <br />showed the topsoil salvage was adequate but detailed compliance <br />with mine plan requirements needs [o be determined. Topsoil <br />pules have been hydromulched and seeded and complaince appears <br />adequate. Success of these seeding efforts cannot be determined <br />ate this time• <br />7L7.17 hydrologic System <br />Considerable effort leas been made to improve the protection of <br />tli~e hydrologic system. Two sediment ponds have been constructed <br />and are near completion. Culverts have been put in several areas• <br />A larger culvert now extends under [he Anchor seam face up carrying <br />drainage water to the main sediment pond. Dam embankments have been <br />hydromulched and seeded [o prevent erosion. <br />Thee access and haul road to the Cameo portal has been surfaced <br />w.i~th rock from the mine. The surface of the road is improved <br />and Violation !13 of 79-V-1-11 should be terminated. The operator <br />isiadvised that continued maintenance and periodic application of <br />durable material to the road surface is required. <br />i <br />Drainage on the haul road ditches and culverts has improved <br />since Violation 114 of 79-V-1-lt was issued thus allowing the <br />notice to be terminated. An additional culvert under the haul <br />road has been requested by the State and should be installed by <br />[he company. <br />~_ <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.