Laserfiche WebLink
<br />MINED LAND RECLAMATION DIVISION <br />Deparimenl of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 60203 <br />303 866-3567 <br />FA%: 303 832 6106 <br />DATE: March 16, 1990 <br />T0: David Berry <br />FROM: Michael Long <br />RE: NOV C-89-031, Apex #2, File #C-81-011 <br />of ~~~ <br />~~~ R9 <br />Ne ~ <br />r X876 ~ <br />Roy Romer, <br />Governor <br />Fretl R. Banta, <br />Division Drtector <br />I have reviewed the above-referenced violation and information concerning <br />abatement extensions. I agree with your handling of the situation to date <br />with one exception, the statement reauirina a revision to bring the drainage <br />control system into compliance. <br />It appears from the information presented that the operator did not construct <br />the drainage control system in compliance with the approved plan, The <br />operator should be required to bring the system into compliance by <br />constructing it secondary to the approved plan. If the operator wishes to <br />modify the plan it should be done under a mechanism other than an abatement. <br />Given this I am requesting that you modify the abatement to remove step 2. <br />MBL/yjb <br />STATE OF COLORADO <br />5235E <br />