Laserfiche WebLink
~~ <br />Battle Mountain Gold <br />NOPV Abatement Requirements <br />page 7 <br /> <br />analysis protocol, shall be submitted to the Division as a technical <br />revision no later than Monday, May 4, 1992. <br />Status: Satisfied - BMG completed the split sample analyses arld submitted <br />the results to the Division on April 21, 1992. <br />- The requirements for protocol development and permit <br />revision were only advanced by the Division on <br />April 21, 1992. <br />- BMG has verbally committed to protocol modification <br />on April 22, 1992. <br />MLRB Amendment: The protocol shall include the sampling of the three <br />lysimeter sets installed in response to Water Court requilrements. <br />The protocol shall specify monthly reporting of results ~o the <br />Division. A third party shall be selected by the Division to <br />complete collection and analysis of water quality sample, at BMG's <br />expense. <br />Copies of the detailed sampling and analysis protocol shaill be <br />provided to interested local parties in San Luis. The Division <br />shall allow the interested local parties to submit comments for the <br />Division's consideration until May 13th. <br />JP/jP <br />Doc No: 2380E <br />