Laserfiche WebLink
c. <br />~ III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules and <br />Regulations, and the permit also are identified below. <br />The road ditch culvert located east of the shop was partially clogged. <br />Therefore some of the drainage in the ditch was overtopping the culvert and <br />flowing out into an area which contained a reclaimed drill site or which was <br />undisturbed. The ditch water was turbid and contained some oil and grease, <br />coal and gravel from the road. Some erosion had resulted from the flow. <br />Drainage on the portal bench was not being conducted properly. Drainage was <br />flowing off the bench over the outslope to the road ditch below. Flow down the <br />outslope had caused some rills and deposition of coal and refuse, and beet <br />pulp material on the outslope. It was also noted that snow removed from the <br />bench is deposited at the top of the outslope. Drainage is supposed to be <br />conducted to the center of the bench to a culvert. Some of the drainage was <br />being handled in this manner. Most of the drainage was not. <br />Due to improper handling of drainage at the portal bench and overtopping of <br />the road culvert NOV C-85-027 was issued. <br />