My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15527
DRMS
>
Back File Migration
>
Revision
>
REV15527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:51 AM
Creation date
11/21/2007 11:06:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/31/1986
Doc Name
PERMIT RENEWAL COLOWYO COAL MINE FN C-81-019
From
MLRD
To
COLOWYO COAL CO
Type & Sequence
RN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />David H. GBtcheA Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richartl D. Lamm <br />Governor <br />December 31, 1986 <br />Mr. Jim Kiger <br />Colowyo Coal Company <br />5731 State Highway 13 <br />Meeker, Colorado 81641 <br />Re: Permit Renewal, Colowyo Coal Mine, File No. C-81-019 <br />Dear Mr. Kiger: <br />According to our records, the mining permit for the Colowyo Coal Mine expires <br />November 4, 1987. As required by Rule 2.08.5 of C.R.S. 34-33-101 et seq., <br />applications for permit renewal shall be filed with the Division at least <br />180 days before the expiration of the existing permit, and the mine operator <br />shall be notified by the Division of the need to renew a permit at least <br />90 days prior to the permit renewal filing deadline. <br />This letter is to notify you of the need to renew the Colowyo Coal Mine <br />permit. Based on the expiration date of the current permit, your application <br />for permit renewal should be received by this office by May 8, 1987. <br />For your convenience, I have enclosed a copy of the application form for <br />permit renewal, The Divisions will review the current permit and produce <br />adequacy comments similar to the mid-term review process. As you have <br />indicated your desire to meet with the Division on this matter, please contact <br />me to arrange a meeting date. <br />If you have any questions, please contact me. <br />Sincerely, <br />~~ 0~-~ <br />Jeffrey H. Deckler <br />Reclamation Specialist <br />JHD/iml <br />Enclosure(s) <br />6482E <br />i-ii <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.