My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-07_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1999-09-07_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:24 PM
Creation date
11/21/2007 11:06:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
9/7/1999
Doc Name
TR-08 APPROVAL WITH ONE STIPULATION
From
DMG
To
CLIMAX MOLYBDENUM CO
Type & Sequence
TR8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ill 1111111111111111 i ~ <br />STATE OF <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1713 Sherman 5[., Ruom 215 <br />DIVISION O F <br />Denver, Colorado 80203 <br />Phone: Uo31eye-3557 ~ MINERAL S <br />FAX: 0031 832-81 D6 ~ <br /> GEOLOGY <br /> RECLAMATION <br /> MIN ING•SA FETY <br />September 7, 1999 <br /> Bill Owens <br /> Governor <br /> Greg E. Walther <br /> Executive Duector <br />Mr. Tony Lucero Michael 8. Long <br />Climax Molybdenum Company Division Director <br />P.O. Box 68 <br />Empire, CO 80438 <br />RE: Hendeton Mine, Technical Revision Approval, Permit No. M•77-342, Revision No. TR-8 <br />Dear Mr. Lucero: <br />On September I, 1999 the Division of Minerals and Geology approved the Technical Revision application <br />submitted to the Division on July 08, 1999, addressing the following: <br />Disposal of dewatered high-density water treatment sludge generated at the Urad wastewater treatment <br />plant into Pond 1.2 at the Henderson Mine. <br />The tetras of the Technical Revision No. 8 approved by the Division are hereby incorporated into Permit No. <br />M-77-342. <br />The conditions of the Division approval aze noted below. Please note that all other provisions of Permit No. <br />M-77-342 remain in full force and effect. <br />Stipulation No. Description <br />The Henderson Mine will develop a strategy to protect the geosynthetic liner in Pond 1.2 during <br />placement of sludge. No sludge will be placed in the pond until liner protection measures have <br />been reviewed and accepted by the Division of Minerals and Geology. <br />If you have any questions, please contact me. <br />Sincerely, <br />./ ;,r ~ y vf,~~ <br />Allen C. Sorenson <br />Reclamation Specialist <br />M~bssbmmYempV.1R V02].q.ACS <br />
The URL can be used to link to this page
Your browser does not support the video tag.