My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25657
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:55 PM
Creation date
11/21/2007 11:05:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981165
IBM Index Class Name
Enforcement
Doc Date
7/31/1985
Doc Name
ACTION TAKEN BY MLRB NOV M-85-058 FN M-81-165
From
MLRD
To
MINE DEVELOPMENT INC
Violation No.
MV1985058
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />The Division recommends that the Board find vi lat' n for failure to comply <br />with permit requirements, specifically Ex. 8~~~~~hart the system was to be <br />designed and constructed to be a closed circuit non-discharging system, and <br />for failure to minimize effects to the hydrologic balance in that vadose zone <br />ground water andthe colluvium have been contaminated. <br />The Division recommends that a cease and desist order be issued from the <br />further addition of cyanide or solution to the system until an amendment is <br />approved which addresses at minimum the repair and reconstructiuon of the <br />lined heapleach pit to assure no further leaks. This is required prior to <br />commemcing any further leaching activities. <br />The Division further recommends that additional financial warranty be <br />submitted to a total of $10,000. <br />In the event that no leaching is to be conducted a plan for temporary <br />cessation should be submitted which would include a plan for continued <br />maintenance at the site. <br />CP The Division recommends that the Board impose a civil penalty for 5 days, <br />based from when the spill was discovered 6/14 to when the solutions were <br />pumped into the steel tanks.on 6/19. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.