My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15421
DRMS
>
Back File Migration
>
Revision
>
REV15421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:44 AM
Creation date
11/21/2007 11:05:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
2/10/2000
Doc Name
PROPOSED DECISION RN-3 ROADSIDE PORTALS PN C-81-041
From
DMG
To
POWDERHORN COAL CO
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Nmural Resources <br />1313 Sherman St., Room 215 <br /> <br />Denver, Colorado 80203 DIVISION O F <br />Phone: (3031 866-3567 MINERALS' <br />FAX: 13071 872-8106 & <br /> GEOLOGY <br /> RECLAMA710N <br />February 10, 2000 MINING•$AFETY <br />Jim Stover <br /> <br />Powderhom Coal Company <br />P.O. Box 1430 gill Owens <br />Governor <br />Greg E. Walther <br />E,<eculive D~renor <br />Palisade, CO 81526 Michael g. Long <br /> Drvis~on Director <br />Re: Proposed Decision <br />Permit Renewal Application No. 3 (RN-3) <br />Roadside Portals, Permit No. C-1981-041 <br />Dear Mr. Stover: <br />Enclosed you will fmd the Division of Minerals and Geology's Proposed Decision Package for Permit Renewal <br />No. 3 at the Roadside Portals. Notice of the proposed decision will be published in The Darly Senrrnel as soon as <br />possible. The first publication will initiate the thirty (30) day public comment period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved renewal materials <br />were sent to the Office of Surface Mining and the Bureau of Land Management. The materials should be sent <br />within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. The permit will not be issued until the Division has received and approved the <br />bond. <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Dan T. Mathe~~ <br />Environmental Protection Specialist <br />DTM/Jrc <br />Enclosure <br />C-RN-0B C19910C1 DTN 20000]09 ~3)3B PM.dac <br />
The URL can be used to link to this page
Your browser does not support the video tag.