Laserfiche WebLink
Ms. Erica Crosby <br />December 10, 1997 <br />Page 2 <br />To the best of my knowledge and belief, based upon my <br />professional expertise, and to the extent possible the <br />reconstructed portion of the pond embankment was constructed in <br />accordance with prudent state-of-the art earthen embankment <br />construction, and in conformance with the Rules and Regulations <br />of the Division. <br />DEC 10 1997 <br />Michael ~tAlt~'ri'Yllai 1~ Date <br />Colorado .,E. 28455:`,¢rq <br />Based on the~2n~-a~mation provided, Seneca believes that all of <br />the steps for abatement of this NOV have been met. Please contact <br />me if you or any other members of the Division have any questions <br />regarding this information. <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt (PWCC) <br />