Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />The Pittsburg & Midway Coal Mining Co. <br />A Chevron Company <br />6400 South Fddler's Green Circle, Englewood, C080111-0991 <br />Mail Address: P.O. Box 6518. Englewood, CA 80155&S1a ~ FAI((307) 9304204 ~ PAOne (303)9303600 <br />CERTIFIED MAIL RECEIPT P 113 482 682 <br />Ms. Susan L. Morrison <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Rm # 215 <br />Denver, CO 80203 <br />Deaz Ms. Morrison: <br />May 14, 1993 <br />Technical Revision <br />Permit C-80-001 <br />R~r'E!S!r~n <br />MAY 17 1993 <br />Divisior ut 1v,~r t y, <br />Enclosed are three (3) copies of Technical Revision 24 to the above referenced permit providing <br />documentation and designs for the Goat Trail drainage control plan. The revision is being <br />submitted as required to partially abate N.O.V's. C-93-024, C-93-025 and C-93-026. <br />The following materials are being provided under this cover letter: <br />1. Application Form for a Revision to a Coal Mining and Reclamation Permit <br />2. Proposed Public Notice <br />3. Revised Table of Contents page 10 <br />4. Revised pages 3.5-Sh, 3.6-3, 3.6-4 and 3.6-4a of the Permit Document narrative <br />5. New Appendix 3.6-$ <br />Upon receipt of approval from your office that the technical revision has been considered complete, <br />I will forwazd complete copies of the revision to Mr. Bill Pulfurd (Craig District Manager, BLM), <br />Mr. Glenn Secrist (Resource Area Manager, BLM Little Snake Resource Area), Mr. Rick <br />Holbrook (OSMRE - Western Service Center) and Mr. Robert Hagen (Director, OSMRE - <br />Albuquerque Field Office). <br />Should you have any questions or require additional information regazding the enclosed <br />information or the permit revision, please contact David Beverlin at the Edna Mine at your earliest <br />convenience. <br />Sincerely, <br />Enclosure <br />cc: David Beverlin -Edna Mine <br />-~~_.~.,.~.o.a` <br />Brian D. Gontarek <br />Environmental Engineer <br />