Laserfiche WebLink
i ~~~ ~~~~~~~~~~~„ ~~~ <br />GE I Consultants Inc. <br />January 8, 2001 <br />Project 980 t 7 <br />Erica S. Crosby <br />Division of Minerals acid Geology <br />1313 Sherman S[., Room 215 <br />Denver, CO 80203 <br />~P~ ~a`~~ <br />G950 Sourh Poeomac Sveer <br />Suim 200 <br />Englewood, CO 80112 <br />303 •GG2.0100 <br />303 •GG2.8757 Fax <br />Re: Clarification and fee transmittal for Technical Revision to Dahlia North Resources Pit <br />for Interconnect Pipeline to the East Sprat Platte Pit, Permit Number M-94-093 <br />Dear Ms. Crosbv: <br />We would like to clarify our request for a technical revision for the interconnect pipeline between <br />the Dahlia North Resources Pit and the East Sprat Platte Pit. This technical revision also includes <br />the portion of the Phase II pipeline from the bolted connection at [he north end of the Phase I <br />construction to the pit boundary included in Permit Number M-94-093. It is our understanding this <br />will eliminate the need for a future Technical Revision when the remaining S to 7-foot long section <br />of pipeline is constructed. <br />We have also enclosed a check in the amount of $188.00 to cover the fee fur this technical revision. <br />Please call Tom Teny or me if you have any questions or require additional information. <br />Sincerely, <br />GEI CONSULTANTS, INC. <br />~. <br />Ro ert J. Hu ak <br />Senior Project Manager <br />c Mike Refer, Aggregate Industries <br />Mike Gay, City of Thornton <br />Andy Legg, City of Thomton <br />RJH/TAT/amh <br />Enclosure Check #2293 in amount of $188.00 <br />9801)DMG T¢M1naal Rnnwn Ul-(11-09 LV .ptl Officer Nationu+ide <br />