Laserfiche WebLink
POWDERHORN <br />COAL COMPANY <br />February 26, 1992 <br />iiiiiiiiiiiiiiiiiii <br />999 <br />Pls. Janet Binns <br />Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, CO 80202-2273 <br />RE: North Decline Technical Revision Request <br />Dear Ms. Binns: <br />P.C. Box 1430 <br />Paiisa0e, Colora0o 61526 <br />(3031 4647951 <br />Fax (303) 4647161 <br />~-~.~~CEf~ ~~ ;. <br />BAR 0 2. 19a~ <br />Mined Land <br />17n1.q.,9tinn r\'~.~ <br />The enclosed technical revision request is being submitted to revise the final <br />contours for the North Decline area and to define the drainage control during <br />the reclamation phase of this area. The approved final contour plan for this <br />area takes into account that this area is a pre-law disturbance and does not <br />return the area to approximate original contours, "AOC". As part of Powderhorn's <br />commitment to reclamation, we are proposing going beyond the approved plan <br />to an AOC configuration for the site. <br />This submission includes a TR request form, a proposed public notice, copies <br />of submission letters to BLM and OSM, and three copies of new and replacement <br />pages and exhibits. These pages and exhibits are designed to replace and/or <br />supplement existing pages and exhibits in the permit application. The following <br />pages and exhibits are enclosed: <br />Page 166, Vol. 1 Revised to indicate enlargement of Pond 7 <br />Page 168, Vol. 1 Revised to include reclamation phase drainage <br />Page 168a, Vol. 1 Added to in clude reclamation phase drainage <br />Page 171b & c, Vol 1 Revised to include reclamation phase drainage <br />Page 174, Vol. 1 Revised to indicate enlargement of Pond 7 <br />Page 178 & 178b , Vol. 1 Revised to describe reclamation phase drainage <br />Page 187, Vol. 1 Revised to eliminate reference to backfilling <br /> the North Decline with refuse <br />AAA6 & 7, Vol. 8 Added to Appendix AAA as runoff calculations <br />areas of alternate drainage control <br />