My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-10-01_REVISION - M1998013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2002-10-01_REVISION - M1998013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:13:56 PM
Creation date
11/21/2007 11:03:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
10/1/2002
Doc Name
Amendment Application
From
Hall-Irwin Corporation
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E -RECLAMATION PLAN <br />The information for this section is intended to satisfy the requirements outlined in Section 6.4.5 <br />of the Colorado Department of Minerals and Geology Construction Material Rules and <br />Regulations. <br />Hall-hwin will continue to use the reclamation process specified in the original permit <br />application for The Shores. The changes to the Reclamation Plan are as follows. <br />1. Reduce areas for future development: Since the mined area will be expanded the area <br />reserved for future development will be reduced from approximately 184 acres to 88 <br />acres. <br />2. Increased water storage: The site will be reclaimed as four ponds resulting in <br />approximately l68 acres of surface area; Pond A will be 50 acres, Pond B will be 35 <br />acres, Pond C will be 53 acres, Pond D will be 34 acres. <br />3. Schedule: <br />Section=Bein il~ined, Timin Estimate <br />Phase 1-5 No Change From Previous Ap royal <br />Phase 6 2 years to mine <br /> 6 months to reclaim <br />Phase 7 2 years to mine <br /> 6 months to reclaim <br />Phase 8 4 years to mine <br /> 1 year to reclaim <br />Phase 9 4 years to mine <br /> 1 year to reclaim <br />Please note that the above schedule is an estimate based on the current market conditions. <br />However, the timing may vary depending upon the demand for construction material and <br />may impact the total life of the mining operation. <br />HALL-IRWIN CORPORATION -THE SHORES AMENDMENT I (#M-1998-013) Page 14 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.