My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25540
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:51 PM
Creation date
11/21/2007 11:03:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Enforcement
Doc Date
5/30/1986
Doc Name
CONSTRUCTION CERTIFICATION FN C-81-034
From
GRAND MESA COAL CO
To
MLR
Violation No.
CV1986044
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Grand Mersa <br />Coat Compare <br />Construction Certification <br />November 1984 - May 1986 <br />First and Columbia <br />P.O. Box 226 <br />Delta, Colo. 81416 <br />Office: (303) 874-7561 <br />Mine: (303) 856`6402 <br />UNDERGRnUND DEVELOPMENT t;ASTE DISPOSAL AREA INSPECTION CHECKLIST <br />Construction Phase Inspected Ohservation~ Comments <br /> Yes No No Ins acted <br />1. VeRe[ation cleared" <br /> X <br />2. Available topsoil removed and <br />stockpiled as approved' X <br />3. Availab'e overburden removed <br />and st~:ckpiled as approved: X <br />4. Waste deposited in 24" nr <br />shalln~•~er Lt Et<~ X <br />5. Each lift compacted to a least Computation sheets attached <br />907, of maximum dry density' X <br />6. Wood and debris being removed" <br /> X <br />7. Fill outslope 3.Sh:ly or less' <br /> X <br />8. Overburden and topsoil cover <br />at least 4' thick? X <br />9. Overburden and topsoil outslope <br />3.5h:1v or less? X <br />10. ~vidence o° structural defects' <br /> X <br />11. Access road and berm installed <br />properly' X <br />12. Drainage above disposal area <br />functional? X <br />13. Drainage within disposal area 5 fight ponding at tae' will be correctf <br />functional' X in the Summer of <br />14. Excessive erosion? <br /> X <br />" ' °"" " `""°` "" "`"° """' - Piezometers have been monitored monthly since last <br />certification, 11-9-E4, with no problems noted. - Temporary cover planted in <br />the Fall of '83 and Spring of '84 growing well. - There has b~aA•.scyq~truction <br />on the d77'~ os 1 ar a s5ince F l1 '~4 <br />I hereby certi.~ t~iat tie inapect~on o_ this disposal site was _° or under <br />my direct supervision and that Lt is constructed in accordant a nt approved <br />dining and Reclamation Plan. ~~ <br />/}~ <br />Date ~ 27- 8G Certified by M.!~ ,%/~; <br />)r `~l 'f <br />Wit: <br />:;ice- I <br />...r* l i ~ ~ h. <br />d <br />
The URL can be used to link to this page
Your browser does not support the video tag.