Laserfiche WebLink
• <br /> <br />The sediment control ditch has been repaired to allow flow <br />only to Pond A. This work was completed July 16, 1986. <br />2. Rather than replace the straw bales that control sediment <br />from the powder magazine road, the berm has been extended around <br />the topsoil stockpile that is down drainage from the road. This <br />is a more permanant solution to controlling sediment from this <br />small disturbance area. This work was completed July 22, 1986. <br />3. The irrigation ditch between Pond A and the Pond A topsoil <br />stockpile has been filled in and reseeded. The ditch was filled <br />in on July 16, 1986 and the area reseeded by July 25, 1986. <br />we feel that all work required to abate these violations has been <br />completed. I would be most appreciative if you could inform us <br />of your next inspection trip to Coal Ridge No. 1. This would al- <br />low us to ensure that all work has been completed to MLRD stand- <br />ards and avoid any further NOV's in the future. <br />Sincerely, <br />~~./~OV <br />E, ter Matthies <br />EPM/jkl <br />