Laserfiche WebLink
<br />I5. Dates Reclamation Work Was Completed: <br />Surface disturbance from drilling (mud pits) were back filled and reclaimed after hole completion. These <br />sites have since been permitted and bonded with [he Colorado Oil and Gas Consevation Commission <br />(OGCC). These sites and roads will be actively used for gas production during the life of the field. <br />Topsoil piles, roads and sediment control facilities have been maintained in accordance OGCC Regulations <br />and where applicable with Division of Minerals and Geology regulations. After bond release only OGCC <br />regulations will apply. <br />16. Description of Results Achieved: <br />Roads and ditches have been maintained on a periodic as needed basis. Culverts are regularity inspected <br />and sediment accumulations cleaned-out. Vegetation has been established on [op soil piles, or [hey have <br />been reseeded and mulched where necessary. <br />17. Copies of Required Notification to Interested Parties: Enclosed <br />18. Newspaper Advertisement and Proof of Publication: Enclosed <br />Page 2 <br />