My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15244
DRMS
>
Back File Migration
>
Revision
>
REV15244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:32 AM
Creation date
11/21/2007 11:02:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/22/2007
Doc Name
Cost Estimate
From
Janet Binns
To
Byron Walker
Type & Sequence
MR220
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :CORMS <br />Task # : 20B State :Colorado <br />Date: 0822/2007 County:Rwtt <br />User : JHB Site : Faidel Creek Mine <br />Permit or other job action : MR220 <br />Task description : Elrcavate 8 dispose Of <br />yOURLY EQUIPMENT COST <br />from in <br />Shin basis : 1 per day <br />Truck/loader team -Track :Generic 8-f0 cy, 6x4 <br />-Loader :CAT 972G (2002) <br />Support equipment -Load area :Cat D9R - 9SU (2005) <br />-Dump area : NA <br />Road maintenance -Motor grader :NA <br />-Water truck <br />Cost Breakdown : mck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer NA NA NA <br />Utilization-machine : 100 90 100 NA NA NA <br />-Ripper attachment: NA NA 20 NA NA NA <br />Ownership cosvhour: $8.94 $29.55 $64.72 NA NA NA <br />Operating cosvhour: $32.96 $41.55 $98.84 NA NA NA <br />Ripper op. cosvhour; NA NA $0.00 NA NA NA <br />Operator cosvhour; $21.75 $32.78 $32.78 NA NA NA <br />Unit subtotals : $63.65 $103.88 $196.34 NA NA NA <br />Number of units : 2 1 i 0 0 0 <br />Group subtotals : Work : $231.18 Support : $196.34 Maintenance : $0.00 <br />Total work team cosvhour : $427.52 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 644 CCY factor : 1.165 volume : 750 LCY <br />Descr.: Shele <br />Rated payload <br />Payload capacity <br />Loading Tool Caoaci <br />Rated capacity (nom. heaped) <br />Descr.: Other -cemented mate <br />Bucket fill factor <br />Adjusted bucket capacity <br />2,100 pounds/LCY Struck volume : 8.00 LCY <br /> Heaped volume : 10.00 LCY <br />27,280 pounds Average volume: 9.00 LCY <br />12.99 LCY Adjusted volume': 10.00 LCY <br />Final truck volume based on number of loader passes : 9.45 LCY <br />'Muck volume etljus~etl m not ezceetl ratetl payloatl pr heapetl volume <br />LCY <br />0.900 <br />4.725 LCY <br />sheet t of 2 <br /> Truck <br />Altitude adj.: 1.000 <br />Job efficiency : 0.830 <br />Net correction : 0.830 <br />Permivjob # : C1982055 <br />Abbreviation :none <br />Filename : CO56.20B <br />Site altitude (ft.) : 7, <br />Loader ~ Sc <br />0.830 <br />0.764 <br />
The URL can be used to link to this page
Your browser does not support the video tag.