Laserfiche WebLink
C~ <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Nalwal Resources <br />1313 Sherman SL, Room 21 i <br />Denier, Colorado R0203 <br />Phone: 13037 Hbb-3567 <br />FAX: 1303) P3'_-81(16 <br />December 5, 1996 <br />Mr. Alan Parkerson <br />Parkerson Construction, Inc. <br />710 South 15th Street <br />Grand Junction, Colorado 81501 <br />COLORADO <br />.~ <br />Re: Orchard Grove Industries, Permit No. M-90-094, Possible Temporary Cessation <br />Dear Mr. Parkerson: <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. lochhead <br />Executive Director <br />Michael B. Long <br />Division Director <br />We recently reviewed the Orchard Grove Ind. Annual Report. The report indicated that the site <br />has been, and may continue to be, inactive for at least six months. Please refer to the <br />Construction Rules and Regulations Sections 1 .13 which state that if an operation ceases <br />production for a period of 180 days or more, the operator must file a Notice of Temporary <br />Cessation with the Board. This notice must state the date of cessation, the reasons for <br />cessation, a plan for the resumption of mining, a description of those activities the operator will <br />take to ensure compliance with the permit reclamation requirements and a description of site <br />maintenance activities to ensure compliance with the performance standards (Rule 31. The <br />Notice of Temporary Cessation should be sent to the Division separate from other <br />correspondence. <br />As an alternative to temporary cessation, you may submit a Technical Revision to your permit to <br />indicate that the operation will be intermittently active throughout its life. The technical revision <br />application must include a description of those activities the operator will undertake to ensure <br />compliance with the permit reclamation requirements, and a description of the site maintenance <br />activities which will ensure compliance with the performance standards (Rule 3)_,, Rule 1 .13.7 <br />addresses this technical revision. <br />Since the annual report indicated that operations have temporarily ceased, you should submit <br />either a request for temporary cessation or a technical revision within the next 45 days. If the <br />request indicates that the site is sufficiently stabilized, we will approve the request for cessation <br />within sixty days of receipt. If the request indicates that there may be some problems with the <br />site, we will either request more information from you, or schedule the site for an inspection. If <br />you submit a technical revision to the permit, we will process it within 30 days. <br />If you have questions or need additional information, contact me at our Durango Field Office, <br />484 Turner Drive, Building F, Room 101, Durango, Colorado 81301, phone (970) 247-5062. <br />Since ..~1 <br />Steve S. Shuey <br />Acting Senior Environment Protection Specialist <br />• <br />III IIIIIIIIIIIII III F <br />999 <br />