My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25461
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:48 PM
Creation date
11/21/2007 11:02:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Enforcement
Doc Date
2/23/1998
Doc Name
SETTLEMENT AGREEMENT NOV CO CV-97-021
Violation No.
CV1997021
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIIII, <br />999 ~~~~++^^® b°, COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~•,'e~ 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />RECEIVED <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CV-97-021 FES 23 1g98 <br />MINE: Raton Creek Mines <br />PERMIT NO.: C-$2-055 <br />OPERATOR/PERMITTEE: <br />Energy Fuels Mining Company <br />ATTENTION: Allen S. Weaver <br />ADDRESS: P.O. Box 449 <br />Florence, CO 81226 <br />Division o[ Mitterals & Geology <br />DATE ISSUED: November 20, 1997 <br />TYPE OF MINE: underground/Non-Federal <br />COUNTY: Las Animas <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on January 29, 1998, the Division and the operator <br />hereby agree as follows: <br />L The amount of the penalty shall be $350.00: <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from the date <br />this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights to review <br />of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed w[th[n ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: ~ito~tcf K ~ N}t n,nq (~ DATE: Z -ZA ~-Q 8 <br />sy /~ /~, O~ ...2~ <br />DIVISION OF MINERALS AND GEOLOGY: <br />By ~l~l~ ~ ~~~~~ DATE: <br />onfere ce Officer <br />By <br />Division Director <br />~ Z ~ 9 S' <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />CRS 34-33-123(8)(c) and (d) <br />M:,OSSI0.C~TEMPNVp1A055 KAG <br />
The URL can be used to link to this page
Your browser does not support the video tag.