My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25453
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:48 PM
Creation date
11/21/2007 11:01:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Enforcement
Doc Date
4/20/2001
Doc Name
EXTENSION OF TIME FOR ABATEMENT NOTICE FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION
Violation No.
CV2001008
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANBORN CREEK MINE <br />NOV CV-2001-008 <br />Attachment to Abatement Extension Approval <br />As permitted in Rule 5.03.2(2)(e), the Division is granting Oxbow Mining Inc.'s request to <br />extend the abatement due date for abatement step no. 2 for NOV CV-2001-008 past the 90 day <br />limitation. The Division's justification for granting this extension is based on the Division's <br />recent field inspections of the area and the operator's extension request letter dated July 10, <br />2001. The Division agrees with Oxbow Mining Inc. that wet field conditions have been, and <br />continue to be, a deterrent to the performance of abatement work. The wet climatic conditions <br />are preventing the mud pits from drying ou[. Climatic conditions are an acceptable circumstance, <br />as outlined in Rule 5.03.2(2)(c)(iv), for an extension beyond 90 days. <br />c:~ms97lsanbom~nov008ex t2a <br />
The URL can be used to link to this page
Your browser does not support the video tag.