Laserfiche WebLink
<br /> <br />Upon Reclamation, the concrete will simply be broken up using an <br />technique commonly employed for the demolition of concrete. A dozer i <br />used. The rubble will simply then be buried on site adjacent from <br />demolished. The rubble will be then be covered with aggregate, have, <br />and revegetated according to the approved plan. <br />Adjustment of the Financial Warranty <br />The asphalt plant is extremely valuable, portable equipment. I <br />reclamation cost will be incurred for it. Additionally, there are no sci <br />associated with the plant. However, an additional reclamation cost will t <br />rubblize and bury the concrete. It is estimate that it will require only abo~ <br />$60/hr. for the loader to rubblize the concrete, and one hour at $60/hr. for <br />bury the rubble and replace the soil. Miscellaneous costs would likely brie <br />around $200 of additional bonding cost. <br />-loader, a <br />d also be <br />e it was <br />replaced, <br />Jo additional <br />ubber ponds <br />ie incurred to <br />t one hour at <br />the loader to <br />1q the total to <br />