My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25382
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:45 PM
Creation date
11/21/2007 11:00:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Enforcement
Doc Date
10/26/2001
Doc Name
SETTLEMENT AGREEMENT NOV CO-2001-014
Violation No.
CO2001014
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ pf CO <br />~oo <br />/~~o <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Sueet, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />III IIIIIIIIIIIII III <br />M1NE: Lorencito Canyon Mine <br />PERMITNO.: C-1996-084 <br />OPERATOR/PERMITTEE: <br />Lorencito Coal Company, LLC <br />ATTENTION: Bruce Addington <br />ADDRESS: 20500 Highway 12 <br />Weston, CO 81091 <br />DATE ISSUED: October 26, 2001 <br />TYPE OF MINE: Surface/Non-Federal <br />COUNTY: Las Animas <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on January 7, 2002, [he Division and the operator <br />hereby agree as follows: <br />]. The amount of the penalty shall be $750.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />[o review of such penalty or of [he violation on which i[ is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: <br />By <br />DNISION OF MINERALS AND GEOLOGY: <br />i <br />B . <br />nference Of rcer <br />By <br />Division Director <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CO-2001-014 <br />DATE: <br />DA ~ ZocL <br />Penalty Adjustment Reviewed <br />(Rule 5.04.3(4)(c)] <br />CRS 34-33-123(B)(c) and (d) <br />c'nvo.+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.