Laserfiche WebLink
• E.chibit C • <br />(continued) <br />Permit Stipulations and Their Status <br />Three stipulations were added to the pewit as a result of Permit Revision <br />~1. These stipulations ana their ;tolls are: <br />Number Stipulation Status <br />16 Prior to beginning construction of Pcnd 005, Active <br />the applicant shall provide the Division with <br />documentation or the right under Colorado Nater <br />Law to ;tore 16.46 acre-feet of water in <br />Pcna 005. <br />17 Prior to initiation of any sediment pond, Active <br />roan, or mining related construction activity <br />in the North Pit expansion area (excluding <br />sediment pond 009 and its access road) the <br />operator will submit and obtain approval for a <br />technical revision application which contains <br />the following elements: <br />A. De*.ailed design plans for sediment pond 005; <br />B. Land form mapping, geotechnical evaluation <br />reports and design plans demonstrating that <br />proposed facilities will not be subject to <br />stability problems which would result in <br />dele*.erious environmental impacts or jeopardize <br />the potential for ;ucces;ful r?clamation; <br />C. .ipcropriate plans for geotechnical <br />menitorinq and remediation of any facilities <br />potentially affected by landslide; or related <br />phenomena. <br />18 Prior to initiation of construction of haul Active <br />road "G", the permittee will submit the <br />landowner request for haul road retention as <br />required by Rule 4.03.1(i)(f)(ii), or will <br />other•~ise modify the reclamation plan to comply <br />with Rule 4,03.1(i)(f). <br />/ern <br />1632f <br />