My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14976
DRMS
>
Back File Migration
>
Revision
>
REV14976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:14 AM
Creation date
11/21/2007 10:59:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
3/24/2005
Doc Name
Additional Documentation
From
Twentymile Coal Company
To
DMG
Type & Sequence
TR47
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TWENTYMILE COAL COMPANY - FOIDEL CREEK MINE <br />TECHNICAL REVISIONS TR 05-45, 46, AND 47 AND MINOR REVISION MR 05-191 <br />SUPPLEMENTAL DOCUMENTATION <br />SUMMARY OF REVISIONS/ADDITIONS (03/05) <br />REVISION/ADDITION DESCRIPTION PLACEMENT INSTRUCTIONS <br />OPERATIONS PLAN -MINE FACILITIES ULE 2.05.3 3 <br />TR OS-46: Pgs 2.05-66 thru Revised to update and clarify Replaces pgs 2.05-66 thm 72 in <br />72 current haulroad configuration Volume I <br /> and use <br />TR 05-47: Pgs 2.05-79, 79.1, Revised to reflect designation of Replaces pgs 2.05-79, 79.1, 92, <br />92 and 170 Area 1 Pit Water Storage Basin and 170 in Volume I <br /> and Thickener Overflow Sump <br /> as mine im oundments <br />MAPS <br />Map 30, Road Profiles and Revised and updated to reflect Replaces Map 30 in Volume V-A <br />Cross-Sections current road confi ations <br />EXHIBITS <br />TR OS-47: Exhibit 8v, New exhibit incorporating Insert after Exhibit 8u in Volume <br />Impoundment impoundment documentation and II-B <br />Documentation for Existing drawing for Existing Area 1 Pit <br />Area 1 Pit Temporary Water Water Storage Basin (includes <br />Stora a Basin Fi re Ex 8v-1 <br />TR 05-47: Exhibit 8w, New exhibit incorporating Insert after Exhibit 8v in Volume <br />Impoundment impoundment documentation and II-B <br />Documentation for Existing drawing for Existing Thickener <br />Thickener Overflow Sump Overflow Sump (includes Figure <br /> Ex 8w-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.