Laserfiche WebLink
RECEt\!ED <br />ExxIBIT E MAY 2 02002 <br />Reclamation Plan DivisionotMi~ralsnndGeolopY <br />Reclamation of the pit will result in banks sloped at least <br />on a 4 to 1 basis. Revegetation will commence as per <br />recommendations of the Soil Conservation Service. <br />Reclamation will commence when an area is completely <br />Mined. For example, when the eastern most portion of <br />of the pit is mined then sloping and revegetation will <br />occur. <br />Upon completion of reclamation the intent is to return <br />the land to IndustriaUCommercial. <br />