Laserfiche WebLink
-3- <br /> Permitted Actual Proposed <br />8. Mineral ownership: <br />(indicate currently N/r. tv/r, rr/A <br />permitted acre for each) <br />Federal: ac., <br />- <br />State: <br />ac., <br />_ <br />Private: ac., <br />Indian: - ac. <br />9. Surface Ownership: <br />(indicate currently <br />pernitted acreage for <br />each ) <br />Federal: ac., <br />- p 0 0 <br />State: <br />ac., <br />- p p 0 <br />Private: <br />ac., <br />- 20 z0 20 <br />Indian: <br />ac. p p p <br />10. Affected area (in acres) 13 13 13 <br />11. Disturbed area (in acres) 13 13 13 <br />12. Acreage of area reclaimed <br />in previous permit term <br />a) backfilled and graded n/a p n/a <br />b) retopsoiled n/a p n/a <br />c) reseeded n/a p n/a <br />13. Acreage for which bond <br />has been released <br />a) 60 percent n/a p n/a <br />b) 85 percent n/a p n/a <br />c) 100 percent n/a p n/a <br />14. Renewa] Term Requested <br />(Years) n/a n/a 5 <br />Note: If the application contains proposed (new) acreage, then a permit <br />revision application form must also be completed for those acrea <br />15. Type of Mine (check one): Underground, - Surface, <br />Combined Surface and underground, Load-Out, x Other- <br />16. Current Permit Status (check one): x Active, Temporary Cessation, <br />Permanent Cessation (reclamation only), -suspended <br />17. Current Estimated Life of Mine in years: ~ 5 <br />