Laserfiche WebLink
1 <br />u t <br />The operator had made initial repairs to the ditch. Because of <br />the extremely wet conditions, equipment could not gain access to <br />the area. I believe this represents a low level of fault. <br />$250.00 is proposed. <br />Good Faith <br />Colowyo repaired the ditch as soon as they were able to gain <br />access, in less than ideal conditions, to abate the NOV in the <br />shortest possible. A D-6 dozer was rented immediately after <br />their own reclamation dozer broke down. i believe the NOV was <br />abated in the shortest time possible and an extraordinary effort <br />was made to achieve compliance given the poor conditions and the <br />fact that they rented a dozer to complete the abatement. A <br />reduction of $250.00 is proposed. <br />