My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25286
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:42 PM
Creation date
11/21/2007 10:58:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Enforcement
Doc Date
5/9/2002
Doc Name
(Faxed) Signed Settlement Agreement
From
Lorencito Coal Company
To
DMG
Violation No.
CV2002001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mav. 9. 2002 <br />Y ~ <br />03PM LORENCITO COAL 719 868 2117 <br />No•3626 <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Shermon 9hroet, Room 215, Denver, Colorado 80203, (303) 866.3567 . <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.. CV-2002-001 <br />MINE: Lorencito Canyon Mine <br />PERMITNO.: C-1996.084 <br />OPERATOR/PERMITTEE; <br />Lorencito Coal Company, LLC <br />ATTENTION: Bruce Addington <br />ADDRESS; 10500 Highway 12 <br />. Weston, CO 81091 <br />P• 2 <br />DATE ISSUED: February 13, 2002 <br />TXPE OF MINE: 5urface/Non•Federal <br />COUNTY: Las Animas <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, an Apri19, 2002, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be $1,800,00;' <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3, Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based, <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer, <br />If not slgnad within ten days, the Division will fix the penalty ei whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the fedora refereed to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: ~o12r~vGL"~ , <br />By - ti. ~ <br />DIVISIO OF MINERALS AND GEOLOGY: <br />By - _ <br />Conference Officer <br />By <br />Division Director . <br />DATE: T ~Z~' ~G <br />DATE: O Z-- <br />Penalty Adjustment Reviewed <br />[Reis s,oa,3(a)(op <br />CRS 34-33-123(a)(c) and (d) <br />1Ya1 ~S/nu JOJ~-~ ~'"" ~ ~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.