Laserfiche WebLink
IV. SUMMARY OF ALTERNATIVES CONSIDERED <br />A. Sylvester Gulch Temporary Road Construction <br />Four alternatives were considered in the EA (Sections 2A.4 ttuough 7) for the Sylvester Road. <br />Alternative 1 Svlvester Gulch Temoorarv Road Construction with Preferred Drainage Handlin¢ and Reclamation <br />[ion. Alternative 1 is the Proposed Action. It considered construction of about one mile of a road constructed <br />primarily from imported fill material in Sylvester Gulch. The road was conceptually designed to be located mostly <br />outside the 50-year floodplain (but within the water influence zone, or WIZ), and would reroute the existing channel <br />into a designed riprap channel. The road construction in the WIZ would remove about 3.3 acres of riparian <br />vegetation. The road was proposed for short- term use through the useful life of the methane drainage drilling <br />project (until about 2008). The road would provide direct access from MCC's private property across the National <br />Forest, and connect with other existing temporary roads being used for the methane drilling project. This road <br />alignment would require exceptions to coal lease stipulations for prohibiting occupancy in riparian areas and steep <br />slopes. This alternative also considered two reclamation options including removal of the imported fill material <br />used for the road, and leaving the imported fill in place. <br />Alternative 2 -Undulating Alignment for Svlvester Gulch Road. Alternative 2 is a design variation of Alternative 1. <br />Under Alternative 2, an alignment that shifted the proposed road closer to the drainage bottom, and evaluated <br />"weaving" up the drainage to keep overall road grade within specifications was considered. The duration, needs for <br />lease exceptions, and riparian impacts are the same as for Alternative 1. <br />Alternative 3 - Meadow Road. Alternative 3 considered MCC's use of the Meadow Road that would route methane <br />drilling traffic from the mine on a re-route of an existing road on private lands, and onto an existing road on the <br />National Forest. The portion of the Meadow Road on private lands would require re-alignment and new road <br />construction. Only road maintenance activities necessary to support larger vehicles would be required on the <br />National Forest. This route would not result in the same cost and timesavings to MCC as Alternative 1 or 2. <br />Alternative 4 - No Action. The No Action alternative considered that the methane drainage drilling project traffic <br />would continue to use the current access route though the Town of Paonia, on County roads and existing Forest <br />Service roads. <br />B. Box Canyon Coal Methane Drainage Wells and Temporary Road <br />Alternative 1. This alternative is [he proposed action. This alternative considered that about one mile of temporary <br />road would be constructed; and 10 MDWs would be drilled from six drill pads. An exception to [he coal lease <br />stipulation prohibiting occupancy in riparian areas would be needed. These activities in Box Canyon would occur <br />over a 5-year period, starting in 2010. <br />Alternative 2. This is the no action alternative that assumed the proposed activities would not occur. <br />C. Box Canyon Shallow Seismic Reflection Survey <br />Alternative 1. This alternative is the proposed action. This alternative assumes that a shallow seismic survey would <br />be performed in Box Canyon over a period of 2 weeks in the 2005 field season. Shallow, small diameter drill holes <br />would be drilled and explosive charges loaded into them. The charges would be detonated, and the resulting seismic <br />data recorded. A small amount of surface disturbance from the drilling would occur, but is easily mitigated. <br />Alternative 2. This is the no action alternative that assumed the proposed activities would no[ occur. <br />V. PUBLIC INVOLVEMENT <br />Project scoping comments for the three project proposals were solicited from appropriate agencies, specific <br />interested parties, and the general public. Sections 2A.2, 2B.2 and 2C.2 of the EA Supplement, provide description <br />Page 13 <br />