Laserfiche WebLink
<br />A. INSPECT AND ENSURE COMPLIANCE WITH THE ACT, <br />INCLUDING MAINTENANCE AND SEDIMENT CONTROL <br />B. DETERMINE IF EROSION WILL BE CONTROLLED OR <br />MINIMIZED. •~~6~u1VCp by ~~ i~N 1M~ ~u~5 ~~,n~,~~~. <br />-~ <br />4. ON THE GROUND OBSERVATIONS INn~~kT~' Y!~/~, <br />A. THE UPPERROADSRRENTLY REQUIRE MAINTENANCE <br />AS THERE IS SOME EROSION OCCURRING <br />B. MAY BECOME SIGNIFICANT IF IT IS ALLOWED TO <br />CONTINUE <br />5. ALL ROADS WITHIN THE PERMIT AREA SHOULD BE DEFINED <br />A. TO ENSURE VEHICULAR TRAFFIC DOESNOTJEOPORDIZE <br />ALL OTHER REGULATED STRUCTURES AT THE MINE <br />SITE. FOR EXAMPLE: <br />1. SEDIMENT PONDS <br />2. EMBANKMENTS <br />3. DRAINAGE CONTROL FEATURES <br />B. AND OTHER PROTECTED RESOURCES. FOR EXAMPLE: <br />1. TOPSOIL <br />2. REVEGETATED AREAS <br />6. FINALLY, IMPORTANT TO HAVE A RECLAMATION <br />PLAN <br />