Laserfiche WebLink
~~ ~~ <br /> <br />4. BMRI continues to collect water samples at several monitoring wells as well as several <br />surface stations on a monthly basis and will continue [o monitor the various aqui8ers and Rito <br />Seco surface flow for months (years) to come. <br />5. As soon as WQCD determines a set of water quality standards for the processed water <br />discharge (from the nanofiltration facility), and issues a revised Cease and Desist, BMRI will be <br />allowed to discharge directly into Rito Seco Creek. <br />6. BMRI continues to reclaim the various disturbed azeas within the permit area; including the <br />waste dumps and the tailings impoundment. <br />I hope this information sufficiently satisfies your questions. If not, please give ma a call or send a <br />letter. <br />Sincerely, -- <br />~~~ <br />James Dillie <br />Environmental Protection Specialist <br />cc: James Stevens <br />Harry Posey <br />