My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25202
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:39 PM
Creation date
11/21/2007 10:57:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Enforcement
Doc Date
10/10/1997
Doc Name
NOV C-97-001 ABATEMENT EXTENSION BEYOND 90 DAYS ROADSIDE MINE C-81-041
From
DMG
To
POWDERHORN COAL CO
Violation No.
CV1997001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iiiiiiiiiiiiiiiiiii <br />STATE OF COLU1~vU <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl o(Nyuml Resources <br />1711 Sherman SL. Room 215 <br />Denver, Color, do 80201 <br />Phone: I}Ol) 866-7 i67 <br />FAX' 110 41 8 11-810fi <br />October 10, 1997 <br />Mr. Larry Reschke <br />Powderhorn Coal Company <br />P.O. Box 1430 <br />Palisade, CO 81526 <br />RE: NOV C-97-001 Abatement Extension Beyond 90 Days <br />Roadside Mine (C-81-041) <br />Dear Mr. Reschke: <br />~I~~ <br />I)EPARTMEI~IT OP <br />NATURAL <br />RESOURCES <br />Hny Romer <br />Governor <br />lames 5 Lochhrad <br />E.ecuuve Dirmor <br />Mkhael B Long <br />Uinsion Dircaor <br />I have reviewed your request of October 8, 1997, for extension of NOV C-97-001 final <br />abatement beyond the current abatement deadline of October 9, 1997. Because the request <br />would further extend the abatement deadline beyond the 90th day following issuance of the <br />NOV, my concurrence with the further extension is required by Rule 5.03.2(2)(e). <br />My understanding is that final abatement of the subject NOV involves construction of a settling <br />pond proposed in pending Technical Revision No. 22. Results of stability analyses required by <br />the Division were not received until recently. For this reason, it will be impossible for the <br />Division to approve the revision authorizing the pond construction until after the abatement <br />deadline has passed. It is also my understanding that interim measures undertaken in response <br />to NOV C-97-001 have addressed the immediate cause of the TSS exceedance for which the <br />NOV waz issued and, that extension of the abatement time frame will not result in any further <br />environmental harm. <br />Therefore, pursuant to Rules 5.03.2(2)(c)(I) and 5.03.2(2)(e), I am authorizing extension of final <br />abatement until December 8, 1997 or, thirty days following closure of the public comment <br />period on the Division's proposed decision for Technical Revision No. 22, whichever is earlier. <br />This is a shorter extension than requested in your October 8, 1997 letter to Dan Mathews. <br />However, thirty days should be more than ample time to complete the pond modifications <br />proposed in Technical Revision No. 22. Considering the length of time which has already passed <br />since this NOV waz issued, it is imperative the Powderhorn Cola Company ,make every effort <br />to complete the abatement work prior to the deadline on the enclosed extension form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.