My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14847
DRMS
>
Back File Migration
>
Revision
>
REV14847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:06 AM
Creation date
11/21/2007 10:57:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Revision
Doc Date
3/5/1996
Doc Name
ASSUMPTIONS FOR PERRY PIT BOND RECALCULATION 3/5/96
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Ni rerals end Geology <br />- ESTIMATING FORM - BULLD02ER LIORK <br />Task #: 4 Prep. uy: CLK Tesk Ffle Name: M098-4 <br />Date: - 02/27/% Permit #:M-90-098 Mine: Perry Pit <br />Permit Action: Re-ca LcuLatim of financial warranty <br />Task Descri pti m: Cut 8 fill along north end rest sides of pond <br />HOURLY EOUIPNENT COST <br />_____________________ Basic Machine: Cat DBN Horsepower: 285 <br /> Blade Type: SENI-UNIVERSAL --------- <br /> Attachment #1: RODS Cab Shift Basis: 1/day <br /> Attachment #2: N/A ---------- <br />Cost Breakdown: <br />---------- Utilization X <br />Ownership cost/hr = 140.05 N/A <br />Operating 8 overhaul cost/hr- dozer = SS 1.67 700 <br /> -ripper = 50.00 N/A <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = 5114.67 Total fleet cost/h r: 5229.33 <br />MATERIAL WANT ITIES <br />___________________ <br />___________________ <br />Initial <br />Swell <br />Loose <br />Volume: 11,284.0 CCY Factor: 1.725 Volume: 72,694.5 LCY <br />Source of quantity take-off: site/permit ---- <br />Source of est. swell factor: N/A <br />+ <br />- - <br />HOURLY PRODUCTION --- <br />______________-= Job Condition Correcti on Factors <br />Avg. push distance: 700 ft. -- --------- --- <br /> Operator.......... 0.75 (avg.) <br />Unadjusted hourly Met. consistency.. 0.90 (Cat tbl) <br />dozer production: 803 LCY/hr Dozing method..... 1.00 (gm.) <br />- ---- - Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (1sh/day) <br />Conpacted fill or embankment Spoil pi Le factor. 1.00 (doz-oc) <br /> - ------ Push gredi mt..... 1.60 (Cat tbl) <br />Avg. push gredi mt: 30.00 X (nag) Altitude deratim. 1.00 (Let tbl) <br /> Material weight... 1.00 (Cat tbl) <br />Avg. site altitude: 5240 ft. Blade type........ 1.00 (S,SU, U) <br />Materiel weight 2300.00 lb/LCY Net Job Correctien 0.90 <br />Mat. Descr.: ---- - <br />GENERAL FILL Adjusted Unit Prod.: 720.51 LCYJhr <br /> - Adjus ted Fleet Production: 1441.07 LCY/hr <br />JOB COST -- <br />Fleet 6ize 2 Dozers) ToteL Job Time: 8.87 Xours <br />Unit Cost 50.159 /LCY Total Job Cost: 52,020.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.