Laserfiche WebLink
<br />RECLAMAi ION WST SUg1ARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Tesk Description <br />Subtotal (K): <br />L. DRILL XOLE/MONITORING YELL SEALING <br />Task No.~ Tesk Description <br />~___________ r_~I <br />sheet 4 of 4 <br />Cost (f) <br />Cost (f) <br />Subtotal (U: <br />N. MISCELLANEOUS RECLAMIIT ION TASKS <br />Tesk No.~ Tesk Description ~ Lost (f) <br />_._..___I_.~..________ ~M.___~___. ___I____________ <br />11 ~ Dewaterirg ~ 522,600 <br />Demolition <br />3 ~ Seeding ~ f14, 704 <br />Fencing <br />5 ~ Mob/Demob ~ f3, 112 <br />Subtotal (M): (40,416 <br />____________ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 579,581 <br />II. INDIRECT COSTS <br />A. fANTRACTOR'S OVERHEAD 3 PROFIT <br />Item No.l <br />~~_ Item Description <br />r <br />""_._ ~ Lost (f) <br />r.___'--' <br />_ <br />I <br />1. ~ ~r____ _ <br />Plblic Liability Insurance.... _ <br />1.550% of I <br />dir. ~ 51,234 <br />2. ~ Cont rector's Performance Bond 0.975% of dir. ~ 5776 <br />3. ~ Cont rector's Profit........... 10.00% of dir. ~ f7,958 <br />4. ~ Job Superinterdont.. <br />Subtotal (A ): f9, 967 <br />------------ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 L P): f89,548 <br />B. DNG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Cost (S) <br />1. ~ Minerals Program Adm 5.00% of cntr.~ (4,477 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (8): (4,477 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f14,445 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 594,026 <br />