My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14847
DRMS
>
Back File Migration
>
Revision
>
REV14847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:06 AM
Creation date
11/21/2007 10:57:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Revision
Doc Date
3/5/1996
Doc Name
ASSUMPTIONS FOR PERRY PIT BOND RECALCULATION 3/5/96
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />ESTIMATING FORM - REVEGETATION NORK cont~d <br />• <br />Filename M098-3 sheet 2 of 2 <br />B. SXRUB E TREE TRANSPLANTS <br />____________________________ ~ ~ MATERIAL: PLANTING: ~ f/FERT. ~ TOTAL ~ TOTAL <br />SPECIES NAME ~ OUAN./ACRE ~ STOCK TYPE 8 5f 2E ~ S/PLANT I f/PLANT ~ PELLET ~ f/PLANT ~ f/ACRE <br />Choke cherry ~ 1 ~ Tabling... 10-13 cu.in. ~ 50.72 ~ (0.60 ~ (1.74 ~ 53.06 ~ f3.06 <br />Green ash ~ 1 ~ Tiling... 10-13 cu.in. ~ fO. Tt ~ (0.60 ~ 51.74 ~ (3.06 ~ f3.06 <br /> Total transplant cost/acre: (6.12 <br />C. SEEDBED PREPARATION <br />Tilling method N1: chisel plowing <br />N2: <br />D. SEED APPLI GTION <br />Seeding method: drill seeding <br />553.95 <br />Total cost/acre: 553.95 <br />____________ <br />Total cost/acre: 560.23 <br />E. FERTIL121NG <br />_______________ FERT[LI2ER / SOIL AMENDMENT ~ UNITS/ACRE ~ UNIT ~ S/UNIT ~ S/ACRE <br /> <br />Materiels used N1: 10-34-0, 18-46-0, 5-10-5 • ~ 200.00 ~ paced ~ 50.20 ~ (40.00 <br />N2: <br />N3: <br /> Total materials cost/acre: f40.00 <br />Appl(cat(on method N1: tractor dram broatkast spreader •• (20.91 <br />N2: <br />F. MULCNING <br />Total application cost/acre: (20.91 <br /> MULCH / NETTING / OTHER MATERIALS ~ UNITS/ACRE ~ UNIT ~ f/UNIT ~ S/ACRE <br /> <br />Materials used N1: atraY (delivered) - tan * ~ 2.00 ~ tan ~ (75.28 ~ 5150.56 <br />N2: ~ ~ ~ ~ <br />N3: <br />N4: <br /> <br /> Total materials tost/acre: (150.56 <br /> <br />Application method N1: <br />power nulcher (hey spr. 1" deep) •• - ----------- <br />(60.11 <br />N2: trinQing (with tractor) • (41.41 <br />N3: <br />Total application costlacre: 5101.52 <br />G. JOB COST =___________ <br />Total area [o be seeded: 15.60 acres. Total f/acre 5754.03 Total Initial Job Lost= 511,762.91 <br />Estimated failure rate: 25.00% of area. Total S/ecre• (754.03 Total Reseeding Costs = 52,940.73 <br />• Reseeding cost itens: A B [ D E F GRAND TOTAL JOB COST = 514,7(13.63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.