My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25169
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:38 PM
Creation date
11/21/2007 10:56:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
7/25/1994
Doc Name
PERMIT C-81-019 COLOWYO COAL CO LP NOV C-94-015 REQUIREMENTS FOR ABATEMENT OF VIOLATION
From
COLOWYO COAL CO LP
To
DMG
Violation No.
CV1994015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ <br />~~ <br />~~,,COAL''~ <br />~~~COMPANY L.P. <br />III IIIIIIIIIIIIIIII <br />5731 State Highway 13 <br />Meeker, Colorado 61641 <br />1303)624~451- <br />July 22, 1994 <br />RECEIVED <br />Confirmation of fax sent on July 22, 1994 <br />~uL 251994 <br />Ms. Susan Burgmaier ~. <br />Environmental Protection Specialist Lit ISIU~101717if16fd~s dlie0lUyy <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Permit C-81-019, Colowyo Coal Company L.P. <br />NOV C-94-015 <br />Requirements for Abatement of Violation <br />Dear Ms. Burgmaier: <br />As detailed in your letter faxed July 18, 1994, Colowyo was to <br />perform two requirements prior to being allowed to continue topsoil <br />stripping operations in the West Pit Area. The two day abatement time <br />frame will start once the hard copy NOV is received at Colowyo. On July <br />22, 1994, the hard copy NOV was received. <br />Requirement 1 requests that adequate structures be constructed. <br />Structure #1, West Pit Pond, was enlarged from its initial capacity to <br />its present 12.8 acre foot capacity with this capacity in place on June <br />28, 1994. Structure #2, Initial Boxcut, was further enlarged from its <br />initial (unsurveyed) capacity to its present 50.3 acre foot capacity with <br />this capacity in place on July 18, 1994. Structure #3, In Pit Control <br />Structure, was also further enlarged from its initial (unsurveyed) <br />capacity to its present 5.7 acre foot capacity with this capacity also <br />in place on July 18, 1994. <br />Requirement 2 requests certifications by an engineer which are <br />enclosed. <br />Colowyo trusts that these responses are adequate for complete <br />abatement of this NOV. Please call if questions arise. <br />Sincerely, <br />~C1irn~C~/.ti!~A <br />Juan Garcia <br />Hydrologist/Environmental <br />Engineer <br />btb <br />Enclosures <br />By Federal Express <br />xc: R. G. Atkinson <br />Central Files <br />
The URL can be used to link to this page
Your browser does not support the video tag.