Laserfiche WebLink
Ci) The first 50 foot lift has been constructed to a grade of <br />~~ approzimately 1.9H:1.OV which is milder than that is the <br />(~ `r; <br />approved permit. <br />C2) There are no bulges, cracks, slips or slumps anywhere is the <br />embanlonent. Compaction testa are good sad the embanlonent ie <br />sound. <br />(3) Water levels have consistently been below the toe of the <br />reiuae, as measured by Lhe refuse well. <br />C4) With the ezception o! some rill and gullying on the brat <br />elope, there have been ao problems with auriace water <br />drainage. <br />(5) Leachable constituents from the reluae have also not been a <br />problem. Chemical analysis of the sediment pond discharge <br />has not shown any major increases is problem ions. <br />~~ <br /> <br />472 <br />Revised 1/88 <br />