Laserfiche WebLink
(Page 4) <br />. ~ <br />M1N6 ill k OR PROSPECTING ID $ M-1992-045 <br />INSPECTION DATE 09/2706 INSPECTOR'S INITIALS SSt <br />The following problems (PB) and/oz possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the pxcvious page should be notified of all <br />corrective actions taken. <br />PROBL>9[8/PO88IBLB VIOLATIONS <br />AlPD <br />CORRECTIV9 ACTIONS <br />DATE <br />1. PROBLfiM: <br /> The permit boundary markers installed by the operator do not PB or pV:PB <br /> reflect the approve permit area of 3 acres in size. TOPTC(SI :NP <br /> 11 30 04 <br /> CORRECTIVE ACTION: <br /> Amec~d the 110(2) permit application to properly reflect the <br /> permit area of 3.6 acres. Currently, the markers delineate the <br /> permit area to be 3.B acres rather than the approved 3.0 acres. <br /> Such amendment must be received by the Division on or before <br /> November 30, 2004. <br />2. PROBLEM: PB or PV:PB <br /> The reclamation plan does not address reclamation of the S) <br />BT <br /> : <br />TOPIC ( <br /> maintenance building. 11 30/04 <br /> CORK P.CTIVB ACTION: <br />~~ <br /> reclemation of the maintenance building in the <br />Address the <br /> amendment application so that the Division can calculate a coat <br /> to remove the structure. If the building is co remain as a <br /> component o! the postmining land uae,(rthen .tipp~val musE tie 1i"~' <br /> documented by the local land use authority by November 30, 2004.1 <br />3. PROBLEM: <br /> The mining end reclamation plan does not address the waste pile PB or PV:PB <br /> created by the operator. TOPIC(S):PK <br /> 11 30 04 <br /> CORPECTIVE ACTION: <br /> Address the creation end reclamation of the waste pile noted on <br /> site. If the pile is to remain in place, the operator will need to <br /> address reclamation of the cut elope in the channel to ultimately <br /> achieve a 3h:iv elope. I! this issue is not addreesed by the <br /> operator, then the Division will revise the reclamation cost <br /> estimate to move the pile back [o the cut elopes to achieve a 3h:iv <br /> slope as eo noted in the reclamation plan. This should be <br /> submitted with item itl noted above. <br />3. PROBLEM: <br />The operator is utilizing water !n Che creek for Che mining pB or PV:PB <br /> <br />operation, but has not submitted the appropriate documentation TOPtCIS):HB <br /> <br />to the Division. 11/30/04 <br /> CORRECTIVE ACTION: <br /> Demonstrate that the operator ie !n compliance with the permit <br /> and applicable Colorado Water Laws regarding the use and <br /> exposure of water in the Cache Croak by November 30, 2004. <br />