Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agenty or organization name :Colorado Diw'sion OI Minerals And Geology <br />Task K: X07 State :Colorado PermiVlobN:C-81-041 <br />Date: 12/73!2000 County :Mesa Abbreviation :none <br />User: JRS Site:ROadside Portals Filename:C041-X07 <br />Permit or otherjob action :Technical Revision 33 <br />Task description : BaeMilURegrade Orill Pad Slot <br />HOURLY EQUIPMENT COST Basic machine:Car D7H Series2 (19981 Horsepower: 215 <br />Blade type :Semi-Universal <br />Adachment no. 1 : ROPS Cab Shill basis : 1 per day <br />AHachment no. 2 : NA <br />Breakdown : Ownership cosVhour <br />Operating cosUhour <br />Ripper op. cosVhour <br />Operator cosVhour <br />Total unit costlhour <br />Initial Swell <br />voume '. 2,793 LCY lector: <br />Source of quantity take-off :Division Estimate <br />Source of est. swell lector: NA <br />HOURLY PRODUCTION <br />Average push tlistance: 100 feet <br />Unatllusted houry production : 565 LCV/hr <br />Material consistency description <br />c.,..~..ua~roe ~,.,,d,..ae <br />Average push gradient : 0.00 % (pos) <br />Average site altitude: 5,000 feel <br />Material weight : 2.900 Ibs/LCY <br />Material weight description <br />Decomposed rack - 50% Rack, 50 a Eerth <br />JOB TIME AND COST <br />FIee1 size : 1 Dozers) <br />Unit cost: $0.429 /LCY <br />Utilization % Cost data source: (CRG) <br />$30.37 NA <br />$42.70 100 <br />$0.00 NA <br />$23.72 NA <br />$95.58 Total Ileet cosUhour ~. $95.56 <br />Loose <br />NA volume: 2,793 LCY <br /> <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 7.00 (Cel HB <br />Dozing meNod: I.00 (gen.J <br />Visibility: 7.00 (avg.) <br />Job efficiency: 083 (lshilr/da <br />Spoil pile : 0.80 //rid-d) <br />Push gradient : 1.00 (Car HB <br />Altitude: 1.00 (Cal HB <br />Material weight: 0.79 (Car HB, <br />Blatle type: I.00 (S or UJ <br />Net correction : 0.39 <br />Atllusted unit production : 222.88 LCV/hr <br />Adjusted fleet production : 22288 LCY/hr <br />Total lob time : 72.53 Hours <br />Total p6 cost: $7,198 <br />