My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14629
DRMS
>
Back File Migration
>
Revision
>
REV14629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:51 AM
Creation date
11/21/2007 10:54:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/27/1989
Doc Name
RESPONSE TO MID TERM REVIEW
From
WEST ELK COAL CO INC
To
MLRD
Type & Sequence
TR56
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CMLRD Mid-term Review <br />October 25, 1989 <br />Page 4 <br />Stipulation 32. -This stipulation has been complied with. Monitoring wells 38- <br />H-1, 38-H-2, 38-H-3, and SW-1 through SW-6 were completed over or near the <br />first panel to be subsided (1 Wt S) as part of the subsidence monitoring <br />program. The 1 W1 S panel has been mined out and was sealed in March, <br />1987. <br />Stipulation 33. -This stipulation has been incorporated on revised page 3-53. <br />Stipulation 35. -Section 4.1, Reclamation, of the Sylvester Gulch fan site <br />revision (Volume 10, Appendix B-8) has been revised to include this stipulation. <br />Stipulation 36. -This stipulation was attached to an earlier drilling program <br />revision and some parts are no longer applicable (e.g. the Solid Minerals <br />Branch of the BLM does not exist). WECC has revised page 2-283 to commit <br />to providing information to the regulatory authority as required. Completion and <br />abandonment procedures often change with the type of drill hole and conditions <br />encountered. WECC has also revised page 2-283 to say that all applicable <br />regulations of the Division and State Engineer's office will be complied with. <br />The surface landowner's requirements, as applicable, will also be met. <br />Should you have any questions regarding this mid-term response, please call myself or <br />Dennis Conn. <br />Sincerely, <br />1 <br />Kathleen G. Welt <br />Environmental Engineer <br />KGW:sds <br />xc: J. L. Coffey <br />D. P. Cdnn <br />S. G. Mowry -CMLRD <br />
The URL can be used to link to this page
Your browser does not support the video tag.