Laserfiche WebLink
Mr. Mike Boulay <br />Diviion of Reclamation, Mining and Safety <br />Page 3 <br />1, but the requested aCxumentation har not been provided Please provide documentation that Pat+cel81-1 <br />was disturbed prior to February25, 1976, or altemattvely, revise the Blockmap to include Parcel <br />81-1 in Block Z. <br />Response: It was out understanding that this documentation was to be provided in the Bond Release <br />Applications, which we did in detail in the Phase I Bond Release application (submitted May 22, 2006) as <br />requested by DRMS. <br />4. ALro at the meeting of June 8, 2006, then was dircursion as to whether lyear of sampling would be sufficient for Block 1 <br />anal. The Division stated that 1 year afsampling was ruffitient for Block 1 anal, while all other Blockr would require <br />success demonstration samplin8 during at least two of the last fouryears of the liability period Text in the fart paragraph <br />on page 13-13.6 (revised OS/ 06) could be interpreted to commit to the hvoyears of sampling for aU of the bond releare <br />blocky (including Block 1). [fie would advise that page 23.13-6 tesrt be amended to clarify that only 1 <br />year ofsamp/ingis required for Block 1, while all other areas are subject to sampling dur[ng two <br />ofthe last four years of the liability period. <br />Response: Page 13-13-6 has been revised as requested. <br />If you or other DMG staff members have further comment or questions, please don't hesitate to contact me <br />@ (970) 846-3648. <br />Sincer~ <br />Roy A. Kano <br />Reclamation Manager <br />Seneca Coal Company <br />enclosure(s) <br />cc John Husband (BLM) <br />Cazl Johnston (OSMRE) <br />