My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14589
DRMS
>
Back File Migration
>
Revision
>
REV14589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:48 AM
Creation date
11/21/2007 10:54:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
3/16/1992
Doc Name
GOLDEN EAGLE MINE PN C-81-013 NEW ELK MINE PN C-81-012
From
MLRD
To
WYOMING FUEL CO
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiniuiii <br />999 <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION of ~~~ <br />Department of Natural Resources rr`-=g4$ <br />N .. <br />1313 Sherman SL, Room 215 , ~~ ,,.~~ , <br />Denver,C080203 .'t,, .,r <br />303 8663567 'raz6' <br />Fn X: 303 8328106 <br />floY Homer, <br />riWBrnIX <br />Michael B. Long, <br />Division Director <br />March 16, 1992 <br />Mr. Ron Thompson <br />Mine Engineer <br />Wyoming Fuel Company <br />10250 Highway 12 <br />Weston, CO 81091 <br />Re: New Elk Mine, Permit No. C-81-012 <br />Golden Eagle Mine, Permit No. C-81-013 <br />Succession of Operator for company name change <br />Dear Mr. Thompson: <br />This letter 1s to inform you of the proper procedures to follow 1n in order to <br />implement the proposed name change from Wyoming Fuel Company to Basin <br />Resources, Inc. <br />The pertinent regulations are contained in Rule 2.08.6. I have enclosed the <br />form that is referred to in 2.08.6C2)(b). I have also enclosed an example of <br />the publication that 1s required under 2.08.6(3)(a). <br />Basically, you have to fill out the enclosed form as per Rule 2.08.6(2)(b). <br />Please note the information needed per Rule 2.08.6(2)(b)(iti>. The <br />performance bond needs to be obtained under the new name, as per Rule <br />2.08.6(2)(a). The proposed change needs to be advertised, per Rule <br />2.08.6(3). After the 15 day comment period passes, as mentioned in <br />2.08.6(3)(b), the Division can give approval for the name change provided that <br />the provisions in 2.08.6(4) and 2.08.6(5) are met. A formal hearing can be <br />requested under 2.08.6(6) within 30 days after notification by the Division of <br />its decision. <br />An AVS check (applicant violator system) will be performed to search for any <br />bond forfeitures or other unresolved obligations incurred in other states. <br />
The URL can be used to link to this page
Your browser does not support the video tag.