My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14576
DRMS
>
Back File Migration
>
Revision
>
REV14576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:47 AM
Creation date
11/21/2007 10:53:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
7/1/1998
Doc Name
EMAIL DESERADO TR 48 SUBSIDENCE
From
D MATHEWS
Type & Sequence
TR48
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiuiii <br />999 <br />To: jap~min <br />Cc: dab <br />Bcc: <br />From: MathewsD~COALODNRML <br />Subject: Deserado TR-48 Subsidence <br />Date: Wednesday, July 1, 1998 15:41:11 MDT <br />Attach: <br />Certify: N <br />Priority: Normal <br />Defer until: <br />Expires: <br />Forwarded by: <br />I think I left a phone message regarding some questions I had on your June 18 <br />memo to me regarding Deserado's TR-48 B seam mine plan and revised subsidence <br />prediction and control plan. But maybe not. <br />Based on certain items in your memo, I fear you may have reviewed the wrong B <br />seam mine plan map. The updated B seam mine plan is Map 120, "Proposed B <br />Mine Plan", with a certification date of 4/27/98. The workings shown on Map <br />135, which your memo references, are relicts of a now defunct plan, In our <br />initial adequacy review letter, I had pointed out the discrepancy between Map <br />120 and Map 135. Operator responded that '...Map 135 is not B-Seam mine <br />plan. Its main purpose is to show the surface facilities over the B-Seam <br />mine area." Obviously, this has caused some confusion, and I will request <br />the operator to properly amend Map 135. <br />Given this, I think several of the concerns and recommendations in your memo <br />may not apply. On page 2, under III.A.7.c.. you mention that panels LW-1B <br />through LW-BB are "projected to be extracted through the year 2023." <br />However, Map 120 shows those panels to be mined through the year 2015. I <br />think your concerns regarding superimposed B and D seam workings, as <br />discussed on p. 2 and p. 3 of the memo may be moot, given that there are <br />apparently no superimposed workings based on overlay of Map 120 (B seam Mine <br />Plan) and Map 119 (D Seam Mine Plan). <br />I apologize for the confusion caused by the map discrepancies, but I need to <br />request that you review Map 120, and revisit your review memo, amending it as <br />appropriate based on the Map 120 B Seam Mine Plan. If you do not have a copy <br />of Map 120, check the public file for TR-48. If the map is not on file, let <br />me know and I will send a copy over. <br />Thanks <br />
The URL can be used to link to this page
Your browser does not support the video tag.