Laserfiche WebLink
<br />, <br />3034522759 TUTTLE RPPLEGRTE 1NC <br />• <br />157 P02 RUG 20 '96 15:01 <br />• <br />EXffi~IT L <br />RECLAMATION COSTS <br />The following reclamation cost estimates a <br />progress at any given time (two upland at1~ <br />TABLE L-1 <br />;slimes that there will be three mining operatio¢~s in <br />one lowland) totaling 58 acres of disturbance. <br />OF RECLAMATION COSTS <br />Costs Amount <br />DISTURBANCE COST TOTAL $146,830.00 <br />CONTRACTOR MOB/DEMOB(8.0%) $ 11,746.40 <br />OV]?RHEAD (18.5%) S 27,163.55 <br />ADMINISTRATIVE (5%) $ 7,341.50 <br />TOTAL PROPOSED BOND $193,081.45 <br />DISTURBED ACREAGE 60 <br />BOND COST PER ACRE $ 3,218.55 <br />TABLE L-2 DECLAMATION COSTS <br /><.:.:;: <br /> Unit Quantity Price Total <br />1) BackfilUGrade Excavation with <br />Overburden at 38:1 V Slope (mining are <br />and settling ponds) CY 68,970 $1.00 68,970.00 <br />2) Scarify Prior to Seeding ACRE 37.0 $100.00 3,700.00 <br />3) Place 4 to 8 Inches Topsoil CY 18,960 $1.00 18,960.00 <br />4) Seeding, Mulching, Fertiliattg ACRE 60 $750.00 45,000.00 <br />5) Reseeding (20%non-germination) ACRE 12 $750.00 9,400.00 <br />6) Placement of Fences (53 acres) L.S $1,200.00 1,00.00 <br />TOTAL COST 146, 30.00 <br />L-1 <br />