Laserfiche WebLink
. . 1 <br />LIST OF STIPULATIONS <br />Stipulations 1 through 3 are ongoing from the previous permit period. <br />Stipulations R1 through R4 have been generated through the renewal process. <br />Stipulation No. 1 <br />KERR COAL IS REQUIRED TO CONSTRUCT ALL DITCHES USING THE DESIGN <br />GRADES RATHER THAN THE GRADES SHOWN ON MAP 16a. IF THIS REQUIRES <br />RELOCATING ANY DITCHES FROM THE LOCATION SHOWN ON THE MAP, THEN A <br />REVISED MAP lba MUST BE SUBMITTED A7 THA7 TIME. <br />Stipulation No. 2 <br />KERR COAL IS DIRECTED TO SUBMIT TO THIS DIVISION ON A REGULAR BASIS <br />DATA FROM THE AERIAL VOLUMETRIC SURVEYING PROGRAM DESCRIBED ON PAGE <br />816-124 OF THE ORIGINAL APPLICATION 70 DETERMINE WHETHER FUTURE <br />OPERATIONAL EXPERIENCE IS CONSISTENT WITH THE PROJECTED SWELL FACTOR <br />OF 24~. <br />Stipulation No. 3 <br />NO LATER THAN 90 GAYS PRIOR TO THE SCHEDULED COMMENCEMENT OF <br />OPERATIONS ON 7HE SECOND BONDING INCREMENT (AS SHOWN ON MAP 46) KERB <br />COAL MUST SUBMIT DETAILED WORST CASE RECLAMATION COST ESTIMATES TO <br />THE DIVISION FOR REVIEW. ANY REQUIRED ADDIT'ONAL BOND AMOUNT MUST BE <br />SUBMITTED AND APPROVED PRIOR TO THE COMMENCEMENT OF OPERATIONS ON <br />THAT INCREMENT. A SIMILAR PROCEDURE SHALL EE FOLLOWED FOR ANY <br />SUBSEQUENT INCREMENTS. <br />Stipulation Mo. Rl <br />THE PERMITTEE IS REQUIRED TO SUBMIT TO THE DIVISION A YEARLY REPORT <br />ON THE PROGP.ESS OF ALL HYDROLOGIC MONITORING WHICH INCLUDES ALL DATA <br />COLLECTED FOR THAT YEAR AND A DISCUSSION ON ANY CONCLUSIONS WHICH CAP! <br />BE DRAWN FROM THE DATA. <br />Stipulation No. R2 <br />KEP.R COAL COMPANY WILL SUBMIT ALL APPLICABLE MAPS, TABLES, AND TEXT <br />WHICH DESCRIBE 7HE TIMING AND PROBABLE SEQUENCE OF MINING OPERATIONS <br />AND RECLAMATION ACTIVITIES AS CURRENTLY PROJECTED DURING THE <br />FORTHCOMING PERMIT TERM. THIS INFORMATION MUST BE FULLY SUBMITTED <br />WITHIN 90 DAYS OF PERMIT RENEWAL. <br />Stipulation No. R3 <br />DUE TO THE RE-CALCULATED VOLUME OF THE TEMPORARY OVERBURDEN <br />STOCKPILE, AND DUE TO THE POSSIBILITY OF NOT OBTAINING THE SUDDUTH <br />LEASE, KERR COAL MUST DEMONSTRATE WITHIN 90 DAYS OF PERMIT RENEWAL <br />THAT APPROXIMATE ORIGINAL CONTOUR CAN BE ACHIEVED. THIS SUBMITTAL <br />MUST INCLUDE ALL APPLICABLE MAPS, TABLES, FIGURES, AND PERTINENT <br />CALCULATIONS TO FULLY DEMONSTRATE THE ACHIEVABILITY OF AOC. <br />