My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14550
DRMS
>
Back File Migration
>
Revision
>
REV14550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:45 AM
Creation date
11/21/2007 10:53:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
5/23/1986
Doc Name
Letter and Findings Document
From
MLRD
To
KERR COAL CO
Type & Sequence
RN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-23- <br />XIV. Operations Description Rules 2.05.2, 2.05.3(1), 2.05.3(2), 4.01 <br />The mine is a truck and shovel operation which progresses to the north, mining <br />through three adjacent but unconnected pits on Federal and private land. The <br />operation removes one seam of coal averaging 40 feet in thickness. <br />The mining sequence employed ensures that vegetation and topsoil are first <br />removed from the area to be mined. The overburden is shot and removed from <br />the pit, and trucked to the previous pit area for backfilling. The coal is <br />then removed from the pit and trucked to the loadout facility south of Walden, <br />Colorado, where it is shipped to consumers via railroad. <br />Since permit issuance, Kerr Coal has greatly reduced the scope of operations <br />at the Marr Strip. An accurate timetable for mining and reclamation <br />activities at the mine has not been submitted to the Division, therefore, the <br />following stipulation is necessary: <br />Stipulation No. R2 <br />KERR COAL COMPANY MUST SUBMIT ALL APPLICABLE MAPS, TABLES, AND TEXT <br />WHICH DESCRIBE THE TIMING AND PROBABLE SEQUENCE OF MINING OPERATIONS <br />AND RECLAMATION ACTIVITIES AS CURRENTLY PROJECTED DURING THE <br />FORTHCOMING PERMIT TERM. THIS INFORMATION MUST BE FULLY SUBMITTED <br />WITHIN 90 DAYS OF PERMIT RENEWAL. <br />With the acceptance of the above stipulation, the operation is in compliance <br />with the requirements of this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.