Laserfiche WebLink
<br /> <br />-3- <br />When the differences between Direct Costs and Indirect Costs are combined, the <br />huge difference, as outlined in the first paragraph of this memo, is created. <br />Because this bond was calculated immediately after year 2, or during the worst <br />case scenario, this difference is at its greatest. However, when the Moffat <br />permit revision is approved, this difference will decrease to $930,800.00. <br />The original MLRD bond calculations for both the West Ridge area and the <br />Moffat area are attached to this memo. <br />4416E/scg <br />